Hampoo has a fully-developed simulation design flow and can provide solutions on SI problems. Based on SI design and timing requirements, signal integrity simulation before routing can help engineers choose components, adjust placement, plan system clock network and confirm topology of key networks. Simulation after routing can help engineers evaluate if the reflection, overshoot, ringing, crosstalk, timing and other parameters match design requirements, therefore, potential SI problems can be found and design reliability can be improved.
EMC, which provides PCB boards with EMC solutions and placement, routing guidelines from schematic design, PCB design perspectives, is to make sure products pass EMC certification standard by modifying and debugging products.
By using DFM Analysis, product cycle period can be shortened and first pass yield (FPY) can be improved, therefore, reliability of products can be improved as well.
PI refers to the conformity degree of system power supply to certain parts after it passes certain transmission network and reaches at certain part ports. The smaller the current system design core power supply voltage is, the bigger is the average current and routing density. Digital component conversion speed is getting faster and faster, which result in the outstanding power network issue.
Enquiry & Suggestion
Tel: 086-755-86185500
Email:sales@hampoo.com





